湘潭电厂300MW机组主蒸汽流量计算模型的修改  被引量:13

Modification of main steam flow calculation model in DAS system for 300MW unit in Xiangtan power plant

在线阅读下载全文

作  者:何军民[1] 李明[1] 

机构地区:[1]湖南省电力试验研究院,湖南长沙410007

出  处:《湖南电力》2005年第5期17-19,共3页Hunan Electric Power

摘  要:对湘潭1,2号机组DA S系统主蒸汽流量指示值出现偏差的原因进行分析,找出原计算模型中存在的问题。将机组热力性能试验的主蒸汽流量与DA S系统指示的主蒸汽流量值进行比较后,确定了新的主蒸汽流量与调节级后压力等测量参数的对应关系,并提出了对原计算模型的修改意见。Deviation causes of main steam flow value indicated in DAS system for Xiangtan power plant unit 1 and unit 2 are analyzed in this paper and problems existing in the original calculation model are found, A new relationship between main steam flow ahd other parameters such as pressure after regu(ating stage is established after comparing main steam flow of performance test and the main steam flow value in DAS system. Finally, modification suggestion of original calculation model is presented.

关 键 词:汽轮机组 主蒸汽流量 计算模型 修改 

分 类 号:TK313[动力工程及工程热物理—热能工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象