检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚文峰[1] 姚建刚[1] 刘昌[1] 彭望成[1] 邓应伟[1]
机构地区:[1]湖南大学电气与信息工程学院,湖南长沙410082
出 处:《浙江电力》2005年第5期4-7,共4页Zhejiang Electric Power
摘 要:传统的阻塞管理从发电侧调整机组出力消除阻塞,但调用高价电能消除阻塞使电网的购电成本较高。文章通过可中断负荷应用于阻塞管理的可行性分析,提出了引入可中断负荷的新型阻塞管理模式,并阐述了该模式下电网总体购电成本的计算方法。3节点算例表明该新型阻塞管理模式下电网的购电成本更低。Transmission congestion is eliminated by adjustment of generation in traditional congestion management, but it makes purchase cost higher that use dear power energy eliminating congestion. This paper proposes a new congestion management model in which interruptible load is introduced .The probability of using interruptible load eliminating congestion and the compute of interruptible load cost is analysed in this paper. This paper gives a method for the purchase cost compute of the electric network in the new congestion management model. A 3-bus system is presented to show that the purchase cost is lower in new congestion management.
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.26.253