检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周新军[1]
机构地区:[1]河北省电力勘测设计研究院,河北石家庄050031
出 处:《电力勘测设计》2005年第5期53-56,共4页Electric Power Survey & Design
摘 要:定洲发电厂是国家“十五”重点项目,一期工程的设计有占地小、投资省的主要特点,为以国产设备打造新型绿色环保电站作出了有益的探索和实践。两台机组投产以来,一直连续长周期稳定运行,已成为河北南网重要的电源支撑点。本文主要介绍了定洲电厂一期工程汽机房在布置及主要管道选材方面的优化设计。Dingzhou Power Plant is one of the significant projects in the course of“The Tenth Fiveyear - plan” . Thefirst course of the project has such traits as small occupied terra and economical investment. It made beneficial exploration and practise on the construction of new type environmental - protection plant with homemade equipments. Since put into production, the two units has been in long periodic steady function, and has been an important supporting point in South Hebei transmission - line system of electric power. This article mainly introduced the optimum design of arrangement and material of the steam - turbine - house
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229