西柏坡电厂循环冷却排水回用处理中试研究  被引量:3

Pilot research on water recirculation for circulating cooling water drainage in Xibaipo Electric Power Plant

在线阅读下载全文

作  者:张先[1] 李福勤[1] 杨静[1] 蒋国华[1] 何绪文[1] 

机构地区:[1]中国矿业大学,北京100083

出  处:《煤炭工程》2005年第10期61-63,共3页Coal Engineering

基  金:国家自然基金资助项目(50448017)

摘  要:考查了采用澄清/过滤/超滤(UF)/反渗透(RO)工艺处理回用西柏坡电厂循环冷却水系统排放水的可行性.中试结果表明,澄清/过滤去除了原水中95%以上的悬浮杂质,是后续膜分离高效稳定运行的必要保障;超滤在30~45min反洗间隔下,膜通量为2~2.5m3/m2.d,压差稳定,出水SDI<2;RO出水电导率为17~23μs/cm,完全满足了电厂锅炉预脱盐补充水的要求.The paper investigated the feasibility of the water drained from the circulating cooling water system in Xibaipo Electric Power Plant for reuse with a settling, filtration, ultra filtration and reversed osmosis technology. The pilot results showed that the settling and filtration operations had removed over 95% of the suspended solids, which were the necessary guarantee to the high efficient and stable operation of the membrane separation in late stage. The ultra filtration was operated with the reversed interval of 30 to 45 minutes. The membrane flux was 2-2.5m^3/m^2. day. The pressure drop through the membrane was stable. The water drained was SDI 〈 2. The electric conductivity of the water from reversed osmosis was 17-23uS/cm. The water can fully meet the requirement of the boiler filled with pre de-salt water in the electric power plant.

关 键 词:超滤 反渗透 循环冷却排水 膜通量 膜压差 

分 类 号:X703[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象