盐下油田-让纳诺尔油气混输管线水试压投产新方法  

New Method for Water Pressure Test for Oil and Gas Combined Pipeline from Yanxia Oil Field to Zhanazhol

在线阅读下载全文

作  者:李贵宾[1] 

机构地区:[1]中国石油天然气管道局哈萨克斯坦地区项目部,河北廊坊065000

出  处:《管道技术与设备》2005年第5期29-31,共3页Pipeline Technique and Equipment

摘  要:以哈萨克斯坦盐下油田至让纳诺尔油气混输管线为例,介绍了采用清洁水作为介质进行全线整体试压,投产采取油顶清管球顶水的施工工艺。此方法避免了在哈国办理上水和排水许可证,缩短了施工周期,又满足该国的环保要求。This paper analyzed the example of an oil and gas combined pipeline, which started from the Yanxia oil field to Zhanazhol. It introduced the construction processes of integral pressure tests in which clean water was used as a medium, and of commissening during which oil pushes the cleaning pig and the cleaning pig pushes water. The afore-mentioned processes avoided application of water giving & drainage permission in Kazakhstan so as to shorten the construction period, and at the same time complied wih the envi- ronmental requirement of Kazakhstan.

关 键 词:混输管道 全线整体试压 油顶球推水投产 环境保护 

分 类 号:TE832.3[石油与天然气工程—油气储运工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象