检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安理工大学水电学院
出 处:《红水河》1996年第1期13-18,共6页Hongshui River
基 金:"八五"国家重点科技攻关项目
摘 要:本文根据碾压混凝土坝薄层浇筑连续上升的施工特点,用三维有限元浮动网格法计算程序,按不同横缝间距的坝段,模拟施工过程对温度场和温度应力进行了仿真计算,揭示了相同施工条件下,横缝间距对坝体最大温降应力、施工期温度场和温度应力影响,对碾压混凝土坝横缝间距选择具有参考价值。in this paper, the temperature field and the stress field of roller compacted concrete dam are calculated with the 3--D FEM floating mesh method program. Such factors as procedure of construction, variationof transverse joints should be'considered and simulated' Under the same construction condition, the stress ofmakeup temperature drop, the temperature field and thermal stress in the construction period have been calculated for various transverse joints. The results is meaningful for reference in the selection of transverse joints.
分 类 号:TV642.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.208