高填方路基基于变形控制的后处理优化设计  被引量:2

Optimal design of post-processing for highway thick filling area based on settlement control

在线阅读下载全文

作  者:童怀峰[1] 杨淑慧[2] 郭院成[1] 

机构地区:[1]郑州大学土木工程学院,河南郑州450002 [2]郑州大学环境与水利工程学院,河南郑州450002

出  处:《河南科学》2005年第6期870-873,共4页Henan Science

基  金:河南省重点科技攻关计划项目资助(0424450011)

摘  要:软土高填方路基施工过程中,土内自由水难以及时排出,产生超静水压力,导致路基固结过程延长,沉降变形稳定时间后移,工期滞后.本文在对无砂砼小桩复合地基在后期荷载作用下的变形分析的基础上,研究了软土路基基于变形控制的后处理的优化设计方法.In the construction of thick filling on highway soft-foundation, the free pore water in the saturation soil of highway foundation is seldom discharged immediately, and the excess pore water pressure comes into being, which result in the delay of consolidation and the lag of settlement stabilization time and time limit for a project. On the basis of settlement analysis of small non-sand concrete pile composition under the action of anaphase load, optimal design method of the post-processing of soft-foundation is researched on the basis of settlement control.

关 键 词:高填方路基 变形控制 后处理技术 优化设计 

分 类 号:TU2[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象