检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]郑州大学土木工程学院,河南郑州450002 [2]郑州大学环境与水利工程学院,河南郑州450002
出 处:《河南科学》2005年第6期870-873,共4页Henan Science
基 金:河南省重点科技攻关计划项目资助(0424450011)
摘 要:软土高填方路基施工过程中,土内自由水难以及时排出,产生超静水压力,导致路基固结过程延长,沉降变形稳定时间后移,工期滞后.本文在对无砂砼小桩复合地基在后期荷载作用下的变形分析的基础上,研究了软土路基基于变形控制的后处理的优化设计方法.In the construction of thick filling on highway soft-foundation, the free pore water in the saturation soil of highway foundation is seldom discharged immediately, and the excess pore water pressure comes into being, which result in the delay of consolidation and the lag of settlement stabilization time and time limit for a project. On the basis of settlement analysis of small non-sand concrete pile composition under the action of anaphase load, optimal design method of the post-processing of soft-foundation is researched on the basis of settlement control.
分 类 号:TU2[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31