检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国管理科学》2005年第5期93-99,共7页Chinese Journal of Management Science
摘 要:针对现代项目管理控制的现实要求,提出以过程管理为基础,通过构建多目标综合调控模型,实现对工程项目多目标体系的综合集成化动态调控。在分析过程动态控制基本原理和多目标综合调控系统过程的基础上,融合控制论方法和网络技术方法,通过选取关键线路上的关键控制点,对控制目标进行实时监控,重点探讨了多目标综合动态调控模型和相应的调控规则机理,以便实现过程管理与多目标调控之间的统一。Aiming at practical requirments of present project management and control, the paper presented to construct integrated multi - object trade - off model based on project process management, so as to actualize integrated and dynamic trade- off of the multi - object system of project. Based on analyzing basic principle of dynamic controlling and integrated multi- object trade- off system process, the paper integrated method of cybernetics and network technology, through monitoring on some critical reference points according to the control objects,emphatically discussed the integrated and dynamic multi- object trade- off model and corresponding rules and mechanism in order to realize integration of process management and trade - off of multi - object system.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28