水布垭大坝河床砂卵石覆盖层强夯处理施工  被引量:3

The forced tamping of the overburdens of gravels in the riverbed of the Shuibuya hydroelectric project

在线阅读下载全文

作  者:张安平[1] 谭必轩[1] 

机构地区:[1]中国葛洲坝集团公司,湖北宜昌443002

出  处:《水力发电》2005年第10期42-44,共3页Water Power

摘  要:水布垭水电站混凝土面板堆石坝坝高233m,采用强夯处理河床砂卵石覆盖层作为大坝基础,是200m以上级高坝第一例。强夯处理结果满足设计要求。强夯加固处理的试验、施工与检测,可为今后同类型堆石坝基础处理的设计与施工提供参考。The concrete faced rockfill dam of the Shuibuya Hydropower Station measuring 233 m in height, was constructed on the sand and gravel layers consolidated by foreed tamping. It is the first of dams over 200 m. The foreed ramping meets well the requirement of design. The testing, construction and inspection of the forced tamping operation on this project may be used as reference material for foundation treatment of projects of similar natures.

关 键 词:大坝基础 砂卵石层 强夯加固 检测 水布垭水电站 

分 类 号:TV223.2[水利工程—水工结构工程]

 