琅琊山水电站地下主厂房气流组织研究  被引量:4

Air distribution in underground main workshop of Langya Mountain Hydroelectric Power Station

在线阅读下载全文

作  者:付祥钊[1] 陈金华[1] 熊翰林[1] 海燕 

机构地区:[1]重庆大学 [2]北京国电水利电力工程有限公司

出  处:《暖通空调》2005年第12期80-83,共4页Heating Ventilating & Air Conditioning

摘  要:在不同的送风量、送风速度、送风温度、风口个数条件下,对琅琊山抽水蓄能电站主厂房顶拱送风方式进行了热态相似模型试验研究,得到了大量数据,对比国内二滩、小湾、龙滩等巨型水电站采用的顶拱均匀送风方案,针对琅琊山电站主厂房机电设备布置特殊性,提出适合该电站主厂房的顶拱非均匀送风方案。Based on the experimental research on the thermal state simulation model of the station. mainly focus on the different manners of vault air supply, such as different quantity, velocity and temperature of air supply and different quantity of air outlet, obtains a great deal of experimental data. Compared with the successfully used vault symmetrical air supply manner in such famous great hydroelectric power stations as Ertan, Xiaowan and Longtan, with the particularity of equipment arrangement in this project, develops the vault asymmetrical air supply manner suitable for the power station.

关 键 词:水电站 主厂房 气流组织 顶拱非均匀送风 热态相似模型 

分 类 号:TV731[水利工程—水利水电工程] TU831[建筑科学—供热、供燃气、通风及空调工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象