施工工艺对桩基桩端效应的影响研究与应用  被引量:1

Study and Application of the Effect of Construction Technology on the End Effect of Piles

在线阅读下载全文

作  者:周红波[1,2] 陈竹昌[2] 

机构地区:[1]上海建科建设监理咨询有限公司,上海200032 [2]同济大学地下建筑与工程系,上海200092

出  处:《地下空间与工程学报》2005年第6期1087-1090,共4页Chinese Journal of Underground Space and Engineering

摘  要:结合工程试桩资料研究桩基施工工艺技术对桩基桩端效应的影响。提出钻孔桩的桩端效应与打入桩(挤土桩)不同,属于桩端减弱效应,即桩端附近土层的摩阻力会明显降低,并随着离开桩端距离的增加而逐渐减弱,同时引入附加泥皮的概念来解释钻孔桩的桩端效应产生的机理,最后提出了改善钻孔桩桩端效应的有效措施一桩端后压浆技术。Based on the test data of bored and driven piles the effect of construction technology on the end effect of pile is studied. The end effect of driven pile ( displacement pile) is different from that of bored pile and for the end effect of bored pile the skin friction in the soil layer adjacent to the pile end is redncing. The degradation degree of skin friction is reduced with the increase of the distance from pile end. The concept of additional mud cake is introduced to explain the mechanism of end effect of the bored pile. The test resets of post-grouting piles indicate that the post-grouting technique is an effective means to improve the end effect of bored pile.

关 键 词:施工工艺 桩端效应 桩侧摩阻力 附加泥皮 

分 类 号:TU473.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象