某深水港岸坡桩基码头设计方案有限元分析  被引量:3

Application of FEM to Analyzing Pile- groups Design of an Dock Structure in a Harbour

在线阅读下载全文

作  者:谢雄耀[1,2] 黄宏伟[1,2] 杜军[1,2] 

机构地区:[1]同济大学岩土工程重点实验室,上海200092 [2]同济大学地下建筑与工程系,上海200092

出  处:《地下空间与工程学报》2005年第6期1104-1108,共5页Chinese Journal of Underground Space and Engineering

基  金:上海市科委基金资助项目(No.03DZ12039)

摘  要:岸坡码头中高承台桩基,其受力特点复杂,是一个典型的被动桩与岸坡相互作用问题。本文采用有限元数值模拟计算,研究了高承台桩基和岸坡土层共同作用的应力和变形,而且进行了多断面的方案比较研究,计算结果很好的反映出了高承台桩基受力变形特点。进而总结出高承台桩桩土共同作用变形的几点规律。Pile foundation in the dock structure project has a complex stress character, which is a typical passive pile - soil interaction problem. This paper presents a numerical method to simulate and studies the stress and distortion of pile - soil interaction by finite dement method ( FEM ). Some comparison researches of some sections have been done. The results reflect properly the stress- strain character of pile foundation in the dock structure, This paper sums up some rules about the pile- soil interaction in the dock structure.

关 键 词:桩基 桩土共同作用 有限元法 数值模拟 

分 类 号:TU473.12[建筑科学—结构工程] TB115[建筑科学—土工工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象