检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:裴炳志[1] 叶见曙[1] 李学文[2] 颜东惶[2]
机构地区:[1]东南大学交通学院 [2]长沙理工大学桥梁与结构工程学院,湖南长沙410076
出 处:《桥梁建设》2005年第6期23-26,共4页Bridge Construction
基 金:湖北省交通科技项目(2002-618-2);湖南省交通科技发展基金项目(200019)
摘 要:通过分析辅助墩对荆州长江公路大桥南汊通航孔主桥的受力影响,探讨了辅助墩与高低塔斜拉桥结构受力的关系,分析了辅助墩设置的最佳位置,并提出了不设置辅助墩所面临的问题及相应的解决办法,可为同类斜拉桥的结构分析、设计提供参考。On the basis of analysis of influences of the subsidiary piers on the mechanical behavior of the navigable main bridge of Jingzhou Changjiang River Highway Bridge over the south branch of the River, this paper conducts a study of relationship of the mechanical behavior between the subsidiary piers and cable-stayed bridge with unequal height pylons, analyzes the best positions the subsidiary piers should be laid out, and points out the problems of not providing the piers for the Bridge and corresponding solutions to the problems. The results of the study and analysis herewith may serve as reference to the structural analysis and design of cable-stayed bridges of similar kind.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31