三峡左岸电站6号机组强迫补气试验研究  被引量:6

Experimental Research on Left Bank No.6 Generator Unit Compulsory Gas-supply of Three Gorges Hydropower Plant

在线阅读下载全文

作  者:万鹏[1] 王海[1] 陈喜阳[1] 郑莉媛[1] 符建平 刘志辉 

机构地区:[1]华中科技大学能源与动力工程学院,湖北省武汉市430074 [2]三峡水电厂,湖北省宜昌市443003

出  处:《水电自动化与大坝监测》2005年第6期28-30,共3页HYDROPOWER AUTOMATION AND DAM MONITORING

摘  要:针对三峡水电厂左岸6号机组真机补气试验,研究了补气量的测量,分析了强迫补气对摆 度、振动和水压脉动的影响,讨论了顶盖补气和底环补气对机组开停机的影响,探讨了补气在机组 启动过程中对转轮应力的影响效果。For the test of left bank No. 6 generator unit gas-supply of the Three Gorges Hydropower Plant, the measurement of gas-supply quantity is introduced. Then the effects of compulsory gas-supply on the swing, vibration and water pressure pulse of the generator unit are analyzed. And the effects of top cover compulsory gas-supply and bottom ring compulsory gas-supply on generator unit opening and shutting-down are discussed. The stress change of the runner during generator unit start-up is also discussed.

关 键 词:水电机组 顶盖补气 底环补气 应力 

分 类 号:TV737[水利工程—水利水电工程] TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象