VRLA蓄电池运行监测管理系统的研究  被引量:1

Study on VRLA Battery Management System

在线阅读下载全文

作  者:孙德新[1] 

机构地区:[1]阿城继电器股份有限公司,阿城150302

出  处:《电源世界》2005年第12期66-68,共3页The World of Power Supply

摘  要:本文通过分析VRLA蓄电池运行失效的原因和使用过程中所关心的问题,研究了电池运行监测管理系统(BMS)应解决的关键问题,主要包括:监测管理系统的合理结构;电池组及电池单体的电压、电流巡检与数据分析;电池单体的内阻测量;电池运行事件记录;剩余容量计算;远程管理。结合BM-6500电池管理系统的设计进行了相关论述。该系统适应于电信、电力、铁路机车及中大型 UPS等后备方式和起动使用情况下的蓄电池监测管理。Based on analysis to the reason of failure and concerning problems of VRLA battery,the key technologies of the BMS (battery management system) were studied. They are: (1) reasonable structure of BMS; (2) battery monitor and data analysis; (3) internal resistance measurement; (4) accident record; (5) capacity and time prediction; (6) remote management. Combined with the experience of BM-6500 battery management system,the related problems were discussed. The system was suitable for VRLA battery used in telecommunica-tion, electric power, railway engine and UPS for back-up and staring.

关 键 词:VRLA蓄电池 监测 管理 内阻测量 

分 类 号:TM911[电气工程—电力电子与电力传动]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象