检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭拥兵
出 处:《西北水电》2005年第4期59-62,共4页Northwest Hydropower
摘 要:简要介绍了三峡水利枢纽工程左岸电站尾水闸门的结构特点及门叶加工技术要求,并在对其加工难点进行了分析的基础上,采用整体划线加工技术,利用专用设备,实现了整体加工,加工精度达到《技术条款》及规范要求。其经验可供超大型平面滑动闸门及同类产品大型结构件的整体划线加工参考和借鉴。It briefly describes structural characteristics of tail water gate and its processing requirements of gate flap on the left bank power plant for Three Gorges Project. On a basis of analyzing its processing difficulties, the integral marking processing technique is adopted with special equipment in order to realize it. The processing accuracy is up to the requirements of Specifications and Codes, and its experience can be furnished for reference for the large plain sliding gates and the integral marking processing of similar structural components.
分 类 号:TV34[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43