基坑施工时下方近距离隧道保护  被引量:2

Measures of preventing the in use tunnel disaster caused by overhead excavation

在线阅读下载全文

作  者:毛朝辉[1] 文志云 刘国彬[1] 

机构地区:[1]同济大学地下系,上海200092 [2]上海浦东新区交通建设发展有限公司,上海2000127

出  处:《上海地质》2005年第4期17-20,共4页

基  金:上海市科学技术委员会资助项目(03QMH1411)

摘  要:随着城市建设的高速发展,出现了不少施工项目。在间距很小的情况下,如何采取有效措施控制隧道的变形,是值得摸索和研究的课题。在已经完工的上海东方路下立交工程施工过程中,依靠有针对性的设计和施工措施,使距其基坑底下3m的地铁2号线隧道得到了很好的保护。文章总结了这些工程措施,并将大部分归为基坑开挖“竖向”时空效应的体现。With the rapid development of urban construction, lots of constructions have being built closely. Specially, it has appeared some excavations just above the subway tunnel in Shanghai city, sometimes these is almost no distance between the excavation and the subway. How to effectively control the deformation of tunnel and prevent the disaster induced by above excavation becomes a subject worthy of groping and researching. In this paper we studied the excavation of Dongfang Road underpass in Shanghai, which is just above the subway No. 2 tunnel and the nearest distance is only three meters. Depend on the effective designing and constructing measures we proposed, the deformation of tunnel is controlled under its limitation and the tunnel was well protected. This paper summarizes these measures and concludes the most part to“vertical time - space effect” of the excavation. Also these valuable measures will benefit the following similar projects.

关 键 词:时空效应 基坑开挖 隧道保护 

分 类 号:TU753.1[建筑科学—建筑技术科学] U231[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象