摘 要:针对水布垭工程较突出的环境地质问题,结合工程施工实际情况,介绍了水布垭坝址下游5个主要滑坡体的综合治理方案:抗滑桩施工、锚索施工、削坡减载、覆盖层明挖和排水施工等.重点阐述了拉锚抗滑桩和锚索施工的施工方法及工艺.从后期安全监测资料分析,治理后的滑坡体处于稳定状态,说明所采用的施工技术是有效的.Based on the special environmental and geological characteristics at the dam site of the Shuibuya Hydro Project and the reality of project construction, an introduction was given to the construction schemes for comprehensively harnessing of the five landslides below the Shuibuya Dam, including anti-slide pile construction, anchor cable construction, slope cutting and load reduction, open-cut overlying stratum, and drainage construction, with emphasis placed on the former two techniques. The analysis of safety monitoring data shows that the landslides after harnessing are in stability, verifying the effectiveness of the construction technology adopted in the project.
分 类 号:TV551.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145