检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈馈[1]
出 处:《建筑机械》2005年第12期26-31,共6页Construction Machinery
摘 要:Tunnel construction in the Yellow River is the mid part of water transfer project from south to north, which located at upriver of Zhengzhou city. Henan province. It is also the most important. the biggest construction, and has lime limit for the project. Its length reach to 19.8 km.Aimed at complicated stratum, the writer analyzed from two points, one is the relation between type of shield machine and different stratum, the other is the relation of among shield machine and hydraulic pressure and osmosis. And then recommended the methods how to choose soil-water shield machine and how to meet the design demand of this special construction.Tunnel construction in the Yellow River is the mid part of water transfer project from south to north, which located at upriver of Zhengzhou city. Henan province. It is also the most important. the biggest construction, and has lime limit for the project. Its length reach to 19.8 km.Aimed at complicated stratum, the writer analyzed from two points, one is the relation between type of shield machine and different stratum, the other is the relation of among shield machine and hydraulic pressure and osmosis. And then recommended the methods how to choose soil-water shield machine and how to meet the design demand of this special construction.
关 键 词:南水北调中线 穿黄工程 盾构选型 设计流量 工程概况 输水流量 控制工期 建筑工程 主体工程 穿黄隧道
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.64