南水北调中线一期穿黄工程盾构选型  被引量:2

Choosing shield machine for tunnel construction in the Yellow River

在线阅读下载全文

作  者:陈馈[1] 

机构地区:[1]中铁隧道集团有限公司,河南洛阳471009

出  处:《建筑机械》2005年第12期26-31,共6页Construction Machinery

摘  要:Tunnel construction in the Yellow River is the mid part of water transfer project from south to north, which located at upriver of Zhengzhou city. Henan province. It is also the most important. the biggest construction, and has lime limit for the project. Its length reach to 19.8 km.Aimed at complicated stratum, the writer analyzed from two points, one is the relation between type of shield machine and different stratum, the other is the relation of among shield machine and hydraulic pressure and osmosis. And then recommended the methods how to choose soil-water shield machine and how to meet the design demand of this special construction.Tunnel construction in the Yellow River is the mid part of water transfer project from south to north, which located at upriver of Zhengzhou city. Henan province. It is also the most important. the biggest construction, and has lime limit for the project. Its length reach to 19.8 km.Aimed at complicated stratum, the writer analyzed from two points, one is the relation between type of shield machine and different stratum, the other is the relation of among shield machine and hydraulic pressure and osmosis. And then recommended the methods how to choose soil-water shield machine and how to meet the design demand of this special construction.

关 键 词:南水北调中线 穿黄工程 盾构选型 设计流量 工程概况 输水流量 控制工期 建筑工程 主体工程 穿黄隧道 

分 类 号:TV554[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象