检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安理工大学水利水电学院 [2]太原理工大学水利科学与工程学院,太原030024
出 处:《水力发电学报》2005年第6期1-5,共5页Journal of Hydroelectric Engineering
基 金:陕西省重点实验室基金项目(02JS37)
摘 要:梯级水电站滚动开发的影响因素间关系复杂,给开发顺序决策带来很大的困难。对于滚动开发顺序的研究若仅从单准则和单因素进行定量分析,就易得出片面结论。本文针对黄河上游梯级滚动开发的实际问题,从探讨梯级水电站滚动开发顺序影响因素入手,建立可适应多种决策分析的层次结构模型。然后运用多种方法进行分析,运用电力电量平衡方法论证开发方案的适应性,通过综合分析得到了不同电力需求下的梯级水电滚动开发决策顺序或者可接受的编序。There is the complex relationship between affecting factors of scrolling development order of cascade hydropower stations, which brings a great deal of difficult of decision-making analysis of development order. It can be easily obtained with one-sided conclusion when scrolling development order is quantitatively analyzed only from single criterion and single factor. This paper analyzes the factors of scrolling development order of hydropower stations in combination with the facts of cascade scrolling development on the upper reach of Yellow River, and establishes the hierarchical structure model adaptable to multi-decision analysis, then analyzes them by various methods and demonstrates the adaptability of developing schemes by means of power balance. In the end, the decision-making order of scrolling development of cascade hydropower stations is obtained under different power demands by comprehensive analysis.
关 键 词:滚动开发 层次结构模型 ELECTREⅡ决策法 梯级电站
分 类 号:TV213.2[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3