拱坝加高培厚中温度与接触耦合分析  被引量:1

The coupling analysis of temperature and contact in heightening and thickening arch dam

在线阅读下载全文

作  者:张社荣[1] 迟守旭[1] 陈敏岩[2] 黄昌清[2] 

机构地区:[1]天津大学建筑工程学院,天津300072 [2]水利部福建水利水电勘测设计研究院,福州350001

出  处:《水力发电学报》2005年第6期30-34,共5页Journal of Hydroelectric Engineering

摘  要:大坝加高时最关心的是新老坝体结合面的模拟及其对坝体整体性和应力的影响,本文对新老坝体结合面进行温度与接触的直接耦合分析,真实模拟接触面力与热的传递机理,结果显示,随着温降值减小,新老坝体结合面之间接触压力增大,接触状态趋于闭合,并通过与整体计算方法对比,说明加高后坝体整体性良好。The simulation of the interface between the original and the heightened and thickened body is a key problem in the stress field analysis of arch dam. To simulate the transfer mechanism of force and thermal in the interface, a method of direct coupling According to the result of tracing the status becomes closer during illustrated that the stability of analysis between temperature and contact is presented in the entirety analysis. analysis course, the contact pressure of the interface increases and the contact the decrease of temperature drop. Comparing with the traditional method, it is the body renewed is close to a whole.

关 键 词:水工结构 加高培厚 直接耦合分析 拱坝 接触 温度 

分 类 号:TV31[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象