基于台背加固后的桥头搭板长度数值计算与分析  被引量:5

Analysis and numerical calculation for the length of approach slap based on the strengthened filling of the abutment

在线阅读下载全文

作  者:丁静声[1] 吴国雄[1] 王卫花[1] 

机构地区:[1]重庆交通学院土木建筑学院,重庆400074

出  处:《重庆交通学院学报》2006年第2期38-41,共4页Journal of Chongqing Jiaotong University

摘  要:设置桥头搭板和加铺土工格栅是处理桥头跳车的两种主要措施.当桥台台背填土的回弹模量提高后,所需桥头搭板长度可以减小甚至搭板完全取消,本文利用重庆梁(平)长(寿)高速公路土工格栅处治桥头跳车得到的有关地基模量提高的数据资料,借助有限元计算手段,计算地基模量、桥台高度与搭板长度之间关系,为桥头搭板的正确设计和施工提供依据.Setting approach slap and paving geogirds are two primary measures to reduce the bridge head bump, The length of the approach slap should be shortened even be cancelled as enhancing the rebound module of the padding in the back of the abutment. According to the data of the ground module heightened by paving geogirds to deal with the bridge head bump in the freeway from Liangping to Changshou in Chongqing, This article analyses the relation among the ground module, the depth of abutment and the length of the approach slap, which can be referenced in the correct design and construction of the approach slap by utilizing finite element program.

关 键 词:桥头跳车 桥头搭板 有限元 地基模量 桥台高度 

分 类 号:U443.82[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象