检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《重庆交通学院学报》2006年第2期38-41,共4页Journal of Chongqing Jiaotong University
摘 要:设置桥头搭板和加铺土工格栅是处理桥头跳车的两种主要措施.当桥台台背填土的回弹模量提高后,所需桥头搭板长度可以减小甚至搭板完全取消,本文利用重庆梁(平)长(寿)高速公路土工格栅处治桥头跳车得到的有关地基模量提高的数据资料,借助有限元计算手段,计算地基模量、桥台高度与搭板长度之间关系,为桥头搭板的正确设计和施工提供依据.Setting approach slap and paving geogirds are two primary measures to reduce the bridge head bump, The length of the approach slap should be shortened even be cancelled as enhancing the rebound module of the padding in the back of the abutment. According to the data of the ground module heightened by paving geogirds to deal with the bridge head bump in the freeway from Liangping to Changshou in Chongqing, This article analyses the relation among the ground module, the depth of abutment and the length of the approach slap, which can be referenced in the correct design and construction of the approach slap by utilizing finite element program.
分 类 号:U443.82[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15