尼尔基沥青混凝土心墙砂砾石主坝设计  被引量:3

Design features of main earth-rock dam with asphalt concrete core in Ni'erji hydroproject

在线阅读下载全文

作  者:鞠连义[1] 赵颖华[1] 刘清利[1] 

机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021

出  处:《水力发电》2005年第11期28-29,32,共3页Water Power

摘  要:尼尔基水利枢纽工程沥青混凝土心墙砂砾石主坝,是决定施工工期、进度和工程投资的主要建筑物之一,因此主坝的合理设计至关重要。经比较,采用碾压式和浇筑式沥青混凝土心墙砂砾石坝较为经济合理,且适合东北地区的气候条件,坝顶部上游面护坡首次采用台阶式现浇混凝土护坡形式。The main earth-rock dam with asphalt concrete core is one of major structures which decide construction period, schedule and project investment in Nierji hydroproject. So the rational design of main dam is extremely important. With comparison, earthrock dam with rolled and cast asphalt concrete core is more economic and rational. Meanwhile, it is suitable for the climate of northeast area. It is the first time that bench concrete slope protection is used for crest upstream slope protection.

关 键 词:沥青混凝土心墙坝 沥青混凝土心墙 砂砾石坝壳 台阶式混凝土护坡 尼尔基水利枢纽 

分 类 号:TV641.42[水利工程—水利水电工程] TV442.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象