检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《水力发电》2005年第11期30-32,共3页Water Power
摘 要:尼尔基水利枢纽工程发电厂房为河床式厂房,总装机容量4×62.5MW。在厂房布置时,充分考虑了工程建设的具体情况,同时结合厂房设备和结构方面的要求,具有机动、灵活、实用的特点,最大限度地进行了优化设计,其中包括新材料、新技术的应用。该设计为同类型发电厂房的布置和优化积累了经验。The power house of Nierji hydroproject is a water retaining type one with a total installed capacity of 4×62.5 MW; are its characteristics. During design of the power house, specific conditions are fully considered as well as requirements of equipment and structure. Optimized design has been implemented to a maximum extent, which has characteristics such as flexibility and practicality. Among these, the uses of new material and technique provides precious experience for arrangement and design optimization of the other similar power houses.
分 类 号:TU271.1[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222