检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘德平[1]
出 处:《电力勘测设计》2005年第6期41-44,共4页Electric Power Survey & Design
摘 要:当架空送电线路工程位于分蓄洪区时,一方面需要分析分蓄洪运用对架空送电线路工程安全的影响,另一方面需要分析由于建设架空送电线路工程可能对分蓄洪区的调度运用所产生的影响。本文以潜江—咸宁Ⅰ、Ⅱ回500kV送电线路工程跨越洪湖东分块分蓄洪区为例,对有关水文分析的内容与方法进行了介绍。When the transmit electric wire lie in the store floodwater areas, it is need to analyse the safe influence of the electric wire projects for using the store floodwater to divide floodwater, on the another hand, it is need to analyses the influence to use the flood storage areas because of the fact that build the electric wire project. This text go back the 500kV Qianjiang - Xianning I, II transmit electric wire project to cross over the east divide pieces of the Honghu flood storage areas as the example, the content and method analysed about relevant hydrology have made an introduction.
分 类 号:TV12[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28