洋山深水港区一期工程深水裸露基岩嵌岩桩施工技术  被引量:1

Technique to Construct Piles Socketed in Deep-water Bare Bedrock for Phase I of Yangshan Deep-water Port

在线阅读下载全文

作  者:徐志栓 尹海卿 

机构地区:[1]第三航务工程局,上海200032

出  处:《中国港湾建设》2005年第6期56-58,共3页China Harbour Engineering

摘  要:文章通过计算,优化方案,采用人造基床作为钢套筒稳桩措施,解决了上海国际航运中心洋山深水港一期工程中码头嵌岩桩的难题。文中还对嵌岩桩施工中的钻机平台、成孔成桩、异常情况处理等作了简单总结。实践证明,人造基床方案是可行的,在施工进度、工程质量及经济上都有较大的优势,具有推广的价值。With calculations and by optimizing the alternatives, artificial foundation beds are used as a measure to stabilize the steel sleeves, thus solving the difficult problems in building rock-socketed piles for the wharfs for the first phase of Yangshan Deep-water Port for Shanghai International Shipping Center. The paper also summarizes briefly the drilling platform, boreholing and building of piles as well as handling of abnormal circumstances. The engineering practice proved that the scheme of artificial foundation bedding is feasible and is more advantageous in ensuring the progress of the works and the engineering quality and also advantageous economically, worth generalizing.

关 键 词:人造基床 稳桩 嵌岩桩 

分 类 号:U655.551[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象