锚钉墙支护技术在深基坑工程中的应用  被引量:1

Application of the anchor strut technology for shoring of deep trench foundation project

在线阅读下载全文

作  者:张根源 

机构地区:[1]中国建筑第一工程局

出  处:《建筑技术》1996年第2期81-85,共5页Architecture Technology

摘  要:北京庄胜商业中心基坑最深14.8m,针对现场环境复杂、土质差和地下水等条件,确定采用锚钉墙支护方案。本文介绍该方案的边坡坡度设计、锚体长度、直径计算、锚体抗拔试验、锚钉墙的施工和位移监测。最后总结了锚钉墙支护的特点,并对一些问题进行了讨论。The construction of a 14. 8m deep foundation of the Beijing Zhuangsheng Shopping Centre project had been found with various complicated difficulties such as the poor soil bearing capacity and troublesome underground water treatment. After due consideration, an application of the anchor strut technology for shoring of deep trench foundation method, ASTSDTFM, was eventually adopted and proved successful. In this article, a large number of technical problems, namely: the design of trench slope, the calculation of anchor strut's length and diameter, the extraction test of anchor strut, the construction and surveillance of ASTSDTFM have been comprehensively introduced. In conclusion, it has summed up the specific features of ASTSDTFM and put forward some helpful suggestions about the application of ASTSDTFM.

关 键 词:深基础 基坑 支护 锚钉墙 插筋补强 

分 类 号:TU473.2[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象