检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙振平[1] 金慧忠[1] 蒋正武[1] 刘朴 王汇文
机构地区:[1]同济大学混凝土材料研究实验室,上海200092 [2]上海浦东工程建设管理有限公司,上海201203
出 处:《建筑技术》2006年第1期60-62,共3页Architecture Technology
基 金:上海市青年科技启明星计划项目(04qmx1428);上海市浦东新区科技攻关项目(PKJ2003-23)
摘 要:倒灌顶升泵送施工是一种新方法。针对赵家沟主桥桥型特点和对混凝土性能的要求,利用经特殊改性的聚羧酸系减水剂,配制了坍落度可保持8h不损失的补偿收缩自密实混凝土。采用这种高性能混凝土,避免了钢管拱内混凝土的沉降和混凝土硬化体与管壁间的空隙,施工效果良好。Concrete backing-up-lifting with pump is a new construction method that has high construction efficiency, good concrete compactness and good integrity. According to the characteristic of the main section of Zhaojiagou Bridge and the requirements for concrete performance, compensate shrinking self-densified concrete whose slump may remain no loss in 8 hours was prepared by using specially-modified polycarboxylate water reducing agent. This kind of high performance concrete has avoided concrete settlement in the steel pipe arch and the gap between the hardened concrete and the pipe wall, reaching a good construction effect..
关 键 词:钢管混凝土拱 倒灌顶升 聚羧酸系减水剂 自密实混凝土 坍落扩展度
分 类 号:TU528[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.93.197