华北-华中联网调试中辛安5061开关重合闸分析  

Analysis of Xin'an 5061 recloser in the Commissioning of North China and Central China Grid Interconnection

在线阅读下载全文

作  者:苏红梅[1] 潘瑾[1] 李璠[1] 任玉刚[2] 

机构地区:[1]河北省电力研究院,河北石家庄050021 [2]沧州供电公司,河北沧州061001

出  处:《华北电力技术》2006年第1期45-47,共3页North China Electric Power

摘  要:华北-华中联网工程调试期间,在辛安侧5061断路器投切辛嘉线空载线路试验中,A相重合闸三相分闸后发生1次重击穿,C相发生3次重击穿,引起河北南网500 kV系统多处出现过电压。对此,根据测试结果进行了详尽分析。During the commissioning of North China Grid and Central China Grid lnterconnection, 5061 circuit breaker on Xin'an side was operated to test the Xin'an Huojia line which carries no load, 1 repeated breakdown was happened on phase A, 3 repeated breakdowns for Phase C. The breakdown caused over voltage in many parts of 500 kV system in South Hebei Power Grid. A detailed analysis was made based on the test results.

关 键 词:调试 重击穿 过电压 