检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵葳
机构地区:[1]中国葛洲坝集团第二工程有限责任公司,湖北宜昌443002
出 处:《水利水电科技进展》2006年第1期40-43,共4页Advances in Science and Technology of Water Resources
摘 要:三峡工程泄洪坝段表孔溢流面主要采用一期预留台阶、二期拉模一次成形的方法施工,体型复杂,拉模施工难度大,施工质量要求高,在生产性试验以及对试验结果进行分析的基础上,对混凝土性能、拉模设计、施工措施等方面进行了改进,形成了一套成熟的拉模施工技术。施工结果表明,施工质量达到了设计要求。The method of pre-setting steps in the first stage and one-time shaping with slip form in the second stage was adopted in construction of spillway surface with crest outlet. With high requirement of construction quality, the project is complicated in shape-type, and difficult in slip form construction. Based on an analysis of experimental results, some improvements were made in concrete performance, slip form design, and construction measures, and a set of mature sllp form construction technique was formed. Practices show that the technique meets the design requirement of construction quality.
分 类 号:TV544[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3