检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李晓峰[1] 张宏业[1] 邓小文[2] 高鹭[1] 王媛[3]
机构地区:[1]中国科学院地理科学与资源研究所,北京100101 [2]中国科学院研究生院 [3]北京师范大学地理学与遥感科学学院,北京100875
出 处:《自然资源学报》2006年第1期16-23,共8页Journal of Natural Resources
基 金:国家自然科学基金资助项目(49971004);国家十五科技攻关项目(2002BA517A11-4);国家科技攻关课题"防沙治沙关键技术研究与示范项目"
摘 要:为了缓解天津水资源严重短缺的困境,利用层次分析法,从水资源保证程度、调水协调难度、可供水量、工程成本、供水管网改造成本、水质、水处理成本、污水处理难度、生态环境风险等角度对天津市主要后备水源进行了综合对比评价。评价结果认为海水淡化、南水北调中线调水、地下咸水开发、海水直接利用可以作为天津市理想的后备水资源开发方案;上游水库调水、南水北调东线调水、引黄调水可以作为应急后备水源方案;污水处理后主要用作灌溉、生态、景观用水。As a city with serious water shortage problem,Tianjin has an urgent need to find new water sources in order to meet the growing demand for water supply.The standby water sources schemes in Tianjin include middle and east routes of south to north water transferring from Yangtze River,importing water from Yellow River, redeploying water from upstream reservoirs of Haihe River,effluent reuse,seawater for direct use,seawater desalination,saline ground water development,etc.In our research,we use analytic hierarchy process to evaluate these schemes with a comprehensive analysis on nine factors,including water supply,difficulty of water source sharing,annual volume of water supply,cost of engineering construction,quality of water, cost of water treatment, cost of water supply pipelines reticulation,handicap of wastewater disposal process and risk of eco-environment.First we analyzed each scheme with the nine factors.Then we used Delphi technique to decide the relative importance of these factors and got a judgment matrix to acquire the weight of them.As a result,seawater desalination got the highest value with the virtue of huge quantity of reserves,high quality of water supply,low ecological and climatic risks and short distance of intake.The middle route water transfer project,saline ground water and direct use of seawater also got higher mark profiting from large reserves,extensive and lower cost. The comparative assessment result indicates that these four schemes are felicitous water sources for municipal utilization in Tianjin.The east route water transfer project,redeploying water from upstream reservoirs and importing water from Yellow River got lower values with disadvantage of water pollution or serious regional contest.They can be only treated as contingent water sources. Although sewage disposal got the lowest mark because of high cost of treatment and supply pipelines construction,sewage treatment must be given priority to be used in irrigation,ecological and landscape demand.
分 类 号:TV213.9[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15