机构地区:[1]河南华能沁北发电有限责任公司,河南省济源市454662 [2]焦作电厂,河南省焦作市454001
出 处:《电力建设》2006年第1期2-4,共3页Electric Power Construction
摘 要:沁北电厂1号炉是我国第1台国产化600 MW超临界直流锅炉。在确定了蒸汽吹管的范围、方式、工艺流程和吹管质量验收标准后,选择了蒸汽吹管的运行参数。蒸汽吹管分2阶段进行:第1阶段为主蒸汽管道吹管;第2阶段为主汽及再热器系统串吹。吹管效果良好,达到了预期的效果,超临界直流炉采用降压吹管取得成功。The No. 1 boiler in Qinbei Power Plant is the I st domestic - made 600 MW supcreritical once - through boiler. After determining the steam blowing scope, mode, process flow and acceptance standard of the blowing quality the operating parameters for the steam blowing have been selected. The steam blowing is divided into 2 stages : for the i st stage blowing of the main steam piping, serial blowing of the main steam and reheat system at the 2nd stage. The result of the blowing is good, which has met the expected result. It proves that pressure reduction blowing method is applied for the supercfitical once - through boiler successfully.
分 类 号:TK224.23[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.87.235