检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张晓萍[1]
机构地区:[1]扬州大学建筑科学与工程学院,扬州225009
出 处:《基建优化》2005年第6期19-21,共3页Optimization of Capital Construction
摘 要:经济评价是建设项目投资决策的重要依据,而合理的影子价格是决定经济评价结论的关键。阐述了影子价格的涵义,分析了影响影子价格的因素。影子价格属于重要的国家参数,原则上由国家有关权威机构测算颁布,但由于影子价格种类繁多,本身也在不断变化,相当一部分投入物、产出物的影子价格仍需要由项目评价人自己计算,对其而言,简便、准确的计算方法至关重要。提出了几种计算影子价格的方法,并指出了取用影子价格时应注意的问题。Economic evaluation is the main basis of the investment decision of construction projects, while reasonable shadow price is the key to decide economic evaluation conclusion. This article not only explains the definition of shadow price, but also analyses the factors that affect the shadow price. As an important national parameter, shadow price should be calculated and enacted by the concerned national authorized organization in principle. But because of the variety of shadow price and constant change of itself, the shadow price of quite a large part of the input and output needs to be calculated by the project appraiser himself, to whom simple and accurate calculation ways are the most important. This article offers several ways to calculate the shadow price, and also figures out some problems that should be paid attention to when using the shadow price.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

