检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:P.Knoop M.De Feyter L.V.Nerom
机构地区:[1]先进信息系统公司
出 处:《钢铁》2006年第1期58-61,70,共5页Iron and Steel
摘 要:热装热送要求连铸机和轧机的生产计划相匹配。介绍一种采用先进算法自动生成热装计划的新系统,根据产品大纲和市场条件,热装比可达85%。目前该系统正在中国一家钢铁企业进行测试,目标是达到80%的热装比。提高热装比需要炼钢和轧钢工序的密切协调,需要操作、维修和计划各个部门的全面配合。The casters and the mill must be scheduled simultaneously for direct hot charging. This paper proposes a novel system that automates the generation of hot charge schedules. Advanced algorithms are implemented to schedule both lines in parallel. Depending on product mix and market conditions, hot charge rates of up to 85 percent are targeted. The system is currently tested in a new integrated steel plant in China where the objective is to reach a hot charge rate of 80 percent. Increasing the hot charge rate is a difficult task that requires strong teamwork and commitment of each employee: Because of the need for a tight synchronization between the melt shop and the mill, cooperation is required from operators, maintenance staff and the scheduling department.
关 键 词:热装 计划 算法 HCScheduler
分 类 号:TG335[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.219.195