检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李杰[1] 郑凯锋[1] 谢尚英[1] 文曙东[1] 栗怀广[1]
机构地区:[1]西南交通大学土木工程学院,成都市610031
出 处:《公路》2006年第1期24-28,共5页Highway
摘 要:广州猎德大桥是新光快速路规划中跨越珠江的一座大型桥梁,本桥的亮点在于其独特的桥塔设计。猎德大桥塔身外观为两个贝壳状弧形壳体相扣,其内外轮廓为椭圆弧段组合而成,单肢塔柱截面类似梯形。整个结构采用预应力混凝土结构,外部包钢壳。结构的多变使桥塔在施工过程中的受力变形分析较为复杂。本文应用组合有限元的方法,采用三维实体单元、板壳单元以及杆单元等详细模拟桥塔施工过程,并对比计算两个初步设计方案,对结构的受力变形给出相对精确的结果。Guangzhou Liede bridge is a long span bridge in the plan of Xinguang Express Road. The highlight is particular design of the bridge tower. The figuration of tower is made of two shells buckled each other. Both sides of its outling are composed of two ellipse segments and the cross-section of the tower column is slmiler to a trapezium. The construction is prestressed concrete and is coated with steel shell. The bridge tower stress and displacement are very complex when it is erected. The paper applys integrated element 3D entlty-element, plate-element and bar-element to exhautively simulate the construction in comparing two schemes of the primary design and comparatively accurate results are got.
分 类 号:U448.25[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117