工程项目分包合同纠纷风险的规避和对策探讨  被引量:4

Discussion on Elusion and Countermeasures of Dissension Risks Concerned with Subcontracting of Engineering Project

在线阅读下载全文

作  者:沈文能[1] 

机构地区:[1]中铁隧道集团二处有限公司,北京101601

出  处:《隧道建设》2006年第1期99-101,共3页Tunnel Construction

摘  要:施工企业在建筑市场竞争中,必须集中自身资源承建重、难、险工程和对企业开拓市场有利的工程,走总承包发展之路。同时,利用社会资源,作为企业资源的补充,即对工程进行专业分包或劳务分包。但是,工程项目分包会产生合同纠纷风险,企业如果对风险不能规避或将之降为可容许风险,必然阻碍施工企业发展。因此,针对工程项目分包合同可能出现的纠纷风险,进行了规避和对策方面的探讨。Under the environment of the present construction marketing competitions, a construction enterprise must concentrate its resources to undertake key, difficult and challenging works as well as any works that are in favor of market enlargement, and take the path of general contracting. Meanwhile, as a supplement to the enterprise's resources, i.e. subcontracting local labors. However, the works subcontracting can not elude the risk or minimize the risk dered. discuss Aiming at the dissension risks that on the elusion and a construction enterprise shall utilize social resources a project into several special work items or employing may produce some risks including contract dissension. If an enterprise to an acceptable extent, the development of the enterprise will be surely hinmay occur in the subcontracting of the engineering projects, the paper tries to of the risks.

关 键 词:工程项目 分包合同 纠纷风险 规避和对策 

分 类 号:U455.1[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象