检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《四川建筑科学研究》2006年第1期105-107,共3页Sichuan Building Science
摘 要:通过对冲积层中的软弱层进行灌浆处理,使难以成孔、扩底及承载能力较低的土层变成容易成孔、扩底且具有足够承载力的良好持力层,从而使基桩长度大大缩短,成桩工艺变得简单,为建设方取得了较好的社会效益和经济效益。同时,减少了施工中的抽水量和对周边环境的影响,从而保证了周边建筑的安全。It is very complex to dig a hole or to expand button for a pile foundation in a soft alluvial layer. A new process, we adopted grouting method to strengthen the soft alluvial layer of soil, was suggested by authors in the paper. By using the process, we could shorten the pile length, and made it have enough bear capacity, and the casting will be easier.The investor would get better social performance and economic performance.At the same time, the influence owing to the construction process to the peripheral environment would be reduced, so that the safety of the building around would be guaranteed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222