检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北省电力勘测设计研究院,河北石家庄050031
出 处:《电力勘测设计》2006年第1期54-59,共6页Electric Power Survey & Design
摘 要:主厂房是电厂的核心建筑,主厂房布置是设计优化的重点。本文结合华能上安电厂2×600MW国产超临界空冷机组的设计投标的成果,按照模块化设计的思路,在合理模块划分的基础上,对模块逐个进行优化,分析每个模块的技术特点、经济性和适用性,在此基础上进行模块优化组合,形成各具特点的主厂房方案,并通过经济技术比选,提出本工程的最优设计方案。The main building is the core building of power plant, and the arrangement of the main building is the emphases of the optimization on engineering. According to the consideration of modularizing engineering under the proper module separation, this paper takes the design bidding result of 2 x 600MW home - made supercritical aircooling units in Huaneng Shangan power plant, optimizing and analyzing each module's technical characteristic, economics and applicability, and combining each module with different application together to form the main building schemes with it's own -character, finally through technical and economic comparison, put forward the optimized engineering schemes for this projecL
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28