机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072
出 处:《水利水电技术》2006年第1期69-72,共4页Water Resources and Hydropower Engineering
摘 要:采用有限元方法,利用邓肯E-B模型及接触面模型,模拟堆石坝的实际填筑和蓄水过程,对观音岩水电站混合坝方案插入式接头结构型式进行三维非线性分析。计算结果表明,在蓄水前后,接头处各接触面上下游堆石部分都有脱开现象,心墙与混凝土在顶部有小范围脱开现象。插入式软接头方案基本可行,可在此基础上进行进一步计算分析,提出相应的优化和改善措施以提高运行可靠度。Based on finite element method, a 3-D nonlinear analysis is made on the structure pattern of the inserted junction for the composite dam alternative to the dam of Guanyinyan Hydropower Station with simulation of the processes of both the construc- tion and the impoundment of the rockfill dam by Duncan E-B model and interface model. The computation results show that each interface of both the upstream and downstream rock-fill sections and between the core and the concrete partly splits at the top before and after the impoundment. However, the alternative of the inserted junction is feasible basically, but the further analysis and computation are to be made on the basis of this, so as to give the relevant optimized and improved measures to enhance the of reliability of the operation concerned.
关 键 词:邓肯E-B模型 插入式接头 接触面模型 三维非线性有限元法 观音岩水电站
分 类 号:TV315[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.161.16