邹县电厂深基坑开挖支护及既有铁路线跨越技术  

Techniques of Supporting for the Underground Foundation Pits and Spanning the Existing Railway at the Zou County Power Plant

在线阅读下载全文

作  者:李云山[1] 马文刚[2] 张庆海[3] 

机构地区:[1]石家庄路桥集团,河北石家庄050091 [2]石家庄铁道学院土木工程分院,河北石家庄050043 [3]石家庄中铁建筑工程公司,河北石家庄050043

出  处:《国防交通工程与技术》2006年第1期52-54,共3页Traffic Engineering and Technology for National Defence

摘  要:结合邹县电厂四期工程0号卸煤沟及转运站工程,介绍了在该工程深基坑开挖中使用的预制桩、钻孔灌注桩锚杆支护技术及架设的铁路线路跨越基坑施工便桥,并应用ANSYS软件对12m基坑的施工过程进行了模拟,结果显示此模拟技术能较好反映实际开挖过程,对同类工程有借鉴意义。With the outline of No. 0 coal unloading ditch and transfer station in the Fourth Zou County Project as an example, the paper introduces techniques used for the underground foundation pits. The techniques include the pre-stressing geotechnical anchoring technique of jack-up piles and pre-east piles and the makeshift bridge spanning the underground foundation pits that lie under the existing railway. By means of the ANSYS, the construction process of the 12-meter underground foundation pit is simulated. The result shows that the simulation can reflect the practical process of excavation. It may serve as a reference for similar projects in future.

关 键 词:深基坑 预制桩锚杆支护 六四军用梁 施工便桥 施工模拟 

分 类 号:TU473.2[建筑科学—结构工程]

 