检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水资源与水电工程科学国家重点实验室武汉大学,武汉430072 [2]中南电力设计院,武汉430071 [3]湖北华电襄樊发电股份有限公司,襄樊441141
出 处:《水动力学研究与进展(A辑)》2006年第1期46-52,共7页Chinese Journal of Hydrodynamics
基 金:国家"973"计划资助(2003CB415206);国家自然科学基金项目(50209012)
摘 要:本文基于温排水物理模型相似关键条件,并研制了一套先进的加热温控系统和温度自动数据采集系统,建立了襄樊电厂二期工程温排水物理模型,试验从三维空间角度详细研究了电厂温排水对受纳水体-汉江的温升影响。通过电厂不同排水情况下排水口附近汉江水体表面温升、横断面温升分布和排水口轴线方向的温升分布的对比分析,推荐最优取排水口位置、布置型式等关键工程参数。Based on the similar laws of physical model of cooling water, the paper has developed a set of advanced heating-controlling and automatic temperature data collecting system, and then built up the cooling water physical model of the second stage of Xiangfan power plant project. Further in 3-D space, the experiment has studied the temperature influence by cool ing water from Xiangfan power plant to the receive water body-Han River. The best outfall and infall position and their arrangement style has been recommended through comparing and analyzing the Han River water surface temperature rising and cross section temperature rising and that in axes direction near the outfall under different condition.
分 类 号:TV131[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.8