小浪底工程1号孔板泄洪洞水流空化原型试验研究  被引量:2

Prototype Observation on Cavitation for Multi-orifice No.1 Bottom Outlet Xiaolangdi Project

在线阅读下载全文

作  者:陈琳 王小霞 魏皓 张东[2] 

机构地区:[1]小浪底水利枢纽建设管理局,河南济源454681 [2]中国水利水电科学研究院,北京100038

出  处:《水力发电》2006年第2期71-74,82,共5页Water Power

摘  要:在库水位为210.18~210.28 m之间时,对小浪底水利枢纽工程1号孔板泄洪洞泄洪情况下多级孔板水流空化特性进行了原型试验。对弧形工作闸门在连续开启过程中各级孔板水流噪声的频谱分析发现,闸门孔口相对开度e/a为0.9时,第二级和第三级孔板处水流噪声声压级突然增加10 dB以上,表明开始出现空化水流,相应三级孔板的水流空化数分别为5.85、5.65和5.03,该结果与考虑缩尺影响修正后的模型试验研究结果基本一致。This paper concerns with the prototype observation findings on cavitation for Multi-orifice No.l Bottom Outlet of Xiaolangdi Project when pool levels are in the range of EL210.18-210.28m. The spectrum analysis on acoustic noise in the flow during the process of the gate opening has been analyzed. It has found that the sound pressure level abruptly increased 10dB or more, thereby indicating that cavitation has incipiented when the gate opening e/a rearches 0.9. The incipient cavitation number of the first to the third orifice is 5.85, 5.65 and 5.03, respectively the observation findings are practically agreeable with model test results when scale effect of cavitation modelingis taken into consideration.

关 键 词:孔板泄洪洞 空化噪声 初生空化数 小浪底工程 

分 类 号:TV651.3[水利工程—水利水电工程] TV135.2

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象