检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贺长宏
机构地区:安康水力发电厂
出 处:《陕西水力发电》1996年第2期24-28,共5页Journal of Shaanxi Water Power
摘 要: 330kV安(康)南(郊)同杆架设双回线是装机容量为800MW的安康水电站的主要外送线路。由于安康电站的水库较小,为不完全年调节,枯水季节全厂停机备用时间很多。全厂停机情况下,安南双回线就处在单侧电源方式下,线路的两套主保护将发生拒动。本文对拒动问题进行了分析,并提出了建议。The 330 kV An-Nan double-circuit lines with same poles is the main transmission line ofAnkang water power station which has a total installed capacity of 800 MW. Because the reservior ofAnkang power saution is small, we can not controll it better in a year. Then all the generators are often stopped during the water shortage periods, owing to the spare capacity undertaken and only one endof the An-Nan line is in power source. Thus, the two sets main protectors will be inactive. This problem is analysed and suggestion is presented in this paper.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117