溢流重力坝拟定剖面尺寸的若干问题  被引量:2

Determination of Profile Dimensions for Spillway Gravity Dam

在线阅读下载全文

作  者:吕兴祖 王瑞骏 

机构地区:西安理工大学

出  处:《陕西水力发电》1996年第2期54-57,共4页Journal of Shaanxi Water Power

摘  要: 溢流重力坝是最广泛采用的坝型之一。为了减少坝体工程量,加大流量系数,本文就WES剖面曲线形式,挑流消能在不同挑角下坝高P1/H与挑距L/H的关系,以及面流和底流消能的堰面尺寸进行了讨论。介绍了用迭代法求解收缩断面水深,以便确定底流消能的有关尺寸。此外,还介绍了遇有完整基岩和软弱结构面时齿墙尺寸的确定。Spillway gravity dam is one of the most widely used dam types. In cider to reduce the volume of dam concrete, WES dam curve is provided. To choose an appropriste flow bucket angle andthe trajectory distance, the relationship of dam height P1/H and the trajectory distance L/H with different bucket angle are demonstrated. In the paper, the iteration method to solve the problem of contracted water depth is also recommended. Besides,. considering the geolosical condition of the bedrock,the size of cut-off wall is determined according to whether the bed rock is solid or weak structural surface existed.

关 键 词:溢流坝 溢流重力坝 尺寸 

分 类 号:TV652.11[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象