电力市场的输电阻塞管理模型研究  

Study on the Model for the Electricity Transmission Obstruction Management in the Electrical Power Market

在线阅读下载全文

作  者:张其亮[1] 

机构地区:[1]安徽大学数学与计算机科学学院,合肥230039

出  处:《重庆工学院学报》2006年第2期130-134,共5页Journal of Chongqing Institute of Technology

摘  要:为既保证消除输电阻塞又保持了电网的购电费用最小,对消除输电阻塞进行了研究,引进机组对各线路潮流值的贡献度的概念,按照逐次处理过载最严重线路以及优先调整贡献度最大的机组出力原则,并采取调整阻塞费用最小的方法,建立规划模型.In order both to guarantee the elimination of electricity transmission obstruction and to mini- mize the purchase costs of power network, this paper studies the elimination of electricity transmission obstruction, introduces the concept of the contribution degree of generator units to tidal current values of every line. A planning model is established according to the principles of dealing one by one with the most overloading lines and first adjusting the generator units with the most contribution degree and by means of the method of minimizing adjustment costs.

关 键 词:模型清算价 报价曲线 贡献度 阻塞管理 

分 类 号:TM72[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象