检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张其亮[1]
机构地区:[1]安徽大学数学与计算机科学学院,合肥230039
出 处:《重庆工学院学报》2006年第2期130-134,共5页Journal of Chongqing Institute of Technology
摘 要:为既保证消除输电阻塞又保持了电网的购电费用最小,对消除输电阻塞进行了研究,引进机组对各线路潮流值的贡献度的概念,按照逐次处理过载最严重线路以及优先调整贡献度最大的机组出力原则,并采取调整阻塞费用最小的方法,建立规划模型.In order both to guarantee the elimination of electricity transmission obstruction and to mini- mize the purchase costs of power network, this paper studies the elimination of electricity transmission obstruction, introduces the concept of the contribution degree of generator units to tidal current values of every line. A planning model is established according to the principles of dealing one by one with the most overloading lines and first adjusting the generator units with the most contribution degree and by means of the method of minimizing adjustment costs.
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112