检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江泽沐
机构地区:[1]北京勘测设计研究院
出 处:《水力发电》1996年第2期39-41,共3页Water Power
摘 要:十三陵抽水蓄能电站机组设备国际招标大致分为三个阶段:(1)准备工作,向国外厂商进行技术咨询、资料收集和初步询价;(2)落实国外贷款,申请日本海外协力基金贷款,中日签订贷款协议;(3)招标文件编制,与中标集团签订合同。通过综合分析,该电站机组水泵比转速选用34m·m3/s左右,机组额定转速为500r/min。The international bidding for .generating unit of Shisanling Pumped-storage Power Plant was (livided into threephases: (1) Preparation. The interested foreign manufacturers were invited to assist the technical consultation. information collection and preliminary enquiry. (2) Confirming the foreign loans. The application of loans from theOverseas Economic Cooperation Fund of Japan have been made. And the loan agreement have been signed betweengovernments of China and Jpapn. (3) Preparing bidding documents and awarding a contract to the successful tenderer.This paper also briefs the selection of main generating unit parameters and the e(luiprnent parameters of the contract.
分 类 号:TV743.342[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222