黄河包头取水河段的动床模型试验与数值计算  被引量:1

Test of Moved River Bed Model of Baotou Water Fetching Reach of the Yellow River and Value Calculation

在线阅读下载全文

作  者:季日臣[1] 杨泉[1] 刘有录[1] 

机构地区:[1]兰州铁道学院

出  处:《人民黄河》1996年第1期17-21,共5页Yellow River

摘  要:针对黄河包头画匠营子河段取水问题,研究水沙变化复杂河段动床河工模型试验设计中的一些问题与数值计算方法。文中着重探讨了起动流速比尺、悬沙和底沙比尺的确定方法,详细给出了二维非恒定流及非平衡输沙的数值计算方法。试验及计算结果与原型河段实测资料吻合较好。Some problems and value calculation method in test design of moved river bed model in the reach with varying water and sediment were inquired in this paper in accordance with the water fetching problem in Huajiangyingzi reach of Baotou City of the Yellow River. The paper probed into the determination method of starting velocity scale, suspanded sediment scale and botom sediment scale in particular, and put forward the calculation method of values of two-dimensional non-fixed flow and non-balanced sediment transportation in detail.Tested and calculated results well coincided with actual data in the reach.

关 键 词:动床模型 数值模拟 取水工程 二维非恒定流 

分 类 号:TV131.616[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象