检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东省电力设计研究院
出 处:《广东输电与变电技术》2006年第1期61-65,共5页Guangdong Power Transmission Technology
摘 要:列举出工程建设中遇到的因有载调压抽头不匹配导致可能不满足变压器并联运行条件的实例,对此进行有关环流和负荷失配率计算分析,比照有关导则的标准和条文,判断得出该工程满足并联运行条件,得出结论:对类似问题均需具体计算分析后再作出判断。As the transformers are with OLTC (on kind tap changer) and its taps are miss-match each other, so that the condition for parallel connection operation couldn't met by them. In this article, ticking off an examples barged up against in engineering construction, the author calculated/analyzed its circle current and load miss-match rate according to the standard/clauses of relative guide rule, estimated the condition for parallel connection operation would be still met in this case, and get a conclusion: the estimation of similar problem should be made after specific calculation/analysis.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90