检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东南大学RC/PC结构教育部重点实验室,南京210096
出 处:《工业建筑》2006年第3期44-46,118,共4页Industrial Construction
基 金:江苏省自然科学基金项目(BK2001011)
摘 要:对于单跨预应力混凝土框架梁和多跨预应力混凝土框架的内跨梁,通过位移法证明了用一定矢高的单波抛物线代替实际预应力筋进行次弯矩的计算,方法简单,结果准确。对于多跨预应力混凝土框架的边跨梁,由于预应力筋布置形式与内跨不同,采用与单跨梁相同的简化方法进行计算,结果可能会有较大误差,建议按实际预应力筋形状计算。For single span beam or interior span beam of prestressed concrete frame, a simplified method for calculating secondary moment was developed, A parabola was used instead of real prestressing steel bar shape in this method. The method is easy and the result is accurate. But for side span beam, the method is not accurate enough because the arrangement of prestressing steel bar in side span is different from that in interior span. It is suggested that secondary moment of side span beam should be calculated with its real shape.
分 类 号:TU378.4[建筑科学—结构工程] U448.217[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13