检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《甘肃林业科技》2006年第1期15-17,45,共4页Journal of Gansu Forestry Science and Technology
摘 要:通过嘉峪关工务段黑山湖防沙工区铁路防风固沙林二白杨、灌木柳等树种的地下滴灌试验,对其灌水量、水分运动等指标进行了计算与分析,初步确定了合理的灌水量、灌水时间和灌溉周期。试验结果表明:滴灌每次灌溉时间为10h,每公顷防风固沙林带地下滴灌年灌水定额为6135m^3,每次灌溉定额306.75m^3;全年灌水时间分别为4~9月每月灌溉3次,10月下旬灌越冬水1次,灌溉时间为20h。This paper,based on the trials using drip-irrigation on sand-fixation species Populus gansuensis and bush-willow in Heishanhu section of Lanxin railway, analyzed the irrigation quota and water movement of the species, and preliminarily specified the rational irrigation quota, duration and frequency. The results showed: for sand-fixation windbreaks, 10 hours are needed in each irrigation using drip-irrigation, the annual irrigation quota is 6 135 m^3/hm^2 and the irrigation quota for each time is 306.75 m^3. The species should be irrigated from April to September and 3 times in each month. Winter irrigation is in the late of October and it needs lasting 20 hours.
分 类 号:S275.6[农业科学—农业水土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229